Case Study: Maltby Light Industrial Covered Land Play
- AGM REAL ESTATE
- Apr 27
- 1 min read
Updated: Apr 28
In 2022, we acquired a strategically located mobile home park in Maltby, WA, zoned for light industrial use. The acquisition represents a classic covered land strategy, generating strong interim cash flow while preserving significant long-term redevelopment potential.

INVESTMENT SNAPSHOT
Phase: In Progress
Location: Maltby
Property Type: Mobile Home Park
Acquisition Date: 2022
Purchase Price: $4,025,000
Equity Raised: $1,300,000
Strategy: Opportunistic
INVESTMENT THESIS
Covered Land Play: Acquired below replacement cost with existing mobile home park cash flow covering holding costs, mitigating downside risk while planning for future industrial development.
Strong Interim Income: Stable tenancy and predictable rental collections provide attractive cash returns during the entitlement and redevelopment planning phases.
Zoning Advantage: The site's light industrial zoning aligns with regional trends favoring logistics, distribution, and industrial users, particularly as demand for last-mile facilities in the greater Seattle metro continues to surge.
Value Creation Opportunity: Long-term upside through potential industrial redevelopment, site consolidation, or strategic sale to an industrial operator seeking critical mass in a supply-constrained market.
CURRENT STATUS
Asset Management: Ongoing operations management of the mobile home park to optimize cash flow and maintain community stability.
Predevelopment Work: Initial feasibility studies and site evaluations for future industrial use are underway.
Market Dynamics: Industrial land in the greater Snohomish County region continues to appreciate, driven by limited new supply and sustained demand from logistics, light manufacturing, and tech-adjacent industries.
Exit Potential: Exit options include redeveloping into a build-to-suit industrial asset, selling to a user or developer, or recapitalizing once redevelopment entitlements are secured.





